After a about two weeks of residing as two pieces of plywood and three wooden planks, today the baseboard was finally assembled. After cutting up the planks and screwing them into the lower baseboard, most of it was completed. After this the upper level retaining wall was screwed into the upper baseboard, along with the road bridge pylons being connected. I will upload more photos in 'The Layout Over Time' and 'Gallery' pages.
Below: The layout assembled and ready to continue planning.
No comments:
Post a Comment